Uncategorized - Steppe Khazar Refinery https://Steppe Khazar Refinery.com.kz Refiine at its best Sat, 26 Apr 2025 21:02:59 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.1 https://Steppe Khazar Refinery.com.kz/wp-content/uploads/2024/08/karafav.png Uncategorized - Steppe Khazar Refinery https://Steppe Khazar Refinery.com.kz 32 32 Laboratory building https://Steppe Khazar Refinery.com.kz/2025/04/26/laboratory-building/?utm_source=rss&utm_medium=rss&utm_campaign=laboratory-building https://Steppe Khazar Refinery.com.kz/2025/04/26/laboratory-building/#respond Sat, 26 Apr 2025 20:55:16 +0000 https://Steppe Khazar Refinery.com.kz/?p=30890 Client: Karachaganak Integrated Organisation (KIO) General Contractor: JS Company “Montazhspetsstroy” Construction area: Aksai, Burlinskiy district, West Kazakhstan oblast, Republic of Kazakhstan Contract execution period: 2001 – 2002 Man-hours liquidated under the Contract – 200,000 man-hours Contract Scope of Work includes: Engineering, Procurement and Construction of the Facility on turnkey basis, including supply of the laboratory equipment

The post Laboratory building first appeared on Steppe Khazar Refinery.

]]>

Client: Karachaganak Integrated Organisation (KIO)

General Contractor: JS Company “Montazhspetsstroy”

Construction area: Aksai, Burlinskiy district, West Kazakhstan oblast, Republic of Kazakhstan

Contract execution period: 2001 – 2002

Man-hours liquidated under the Contract – 200,000 man-hours

Contract Scope of Work includes: Engineering, Procurement and Construction of the Facility on turnkey basis, including supply of the laboratory equipment

The post Laboratory building first appeared on Steppe Khazar Refinery.

]]>
https://Steppe Khazar Refinery.com.kz/2025/04/26/laboratory-building/feed/ 0
57 INDUSTRIAL BUILDINGS https://Steppe Khazar Refinery.com.kz/2025/04/26/57-industrial-buildings/?utm_source=rss&utm_medium=rss&utm_campaign=57-industrial-buildings https://Steppe Khazar Refinery.com.kz/2025/04/26/57-industrial-buildings/#respond Sat, 26 Apr 2025 20:48:31 +0000 https://Steppe Khazar Refinery.com.kz/?p=30884 Client: Karachaganak Integrated Organisation (KIO) General Contractor: Vegyepszer Zrt. (Hungary) Contractor:  JS Company “Montazhspetsstroy” Construction area: Aksai, Burlinskiy district, West Kazakhstan oblast, Republic of Kazakhstan Contract execution period: 1999 – 2002 Man-hours liquidated under the Contract – 450,000 man-hours     Contract Scope of Work includes: detailed design, fabrication and supply of 57 industrial buildings of different purpose (compressor facility, pump […]

The post 57 INDUSTRIAL BUILDINGS first appeared on Steppe Khazar Refinery.

]]>

Client: Karachaganak Integrated Organisation (KIO)

General Contractor: Vegyepszer Zrt. (Hungary)

Contractor:  JS Company “Montazhspetsstroy”

Construction area: Aksai, Burlinskiy district, West Kazakhstan oblast, Republic of Kazakhstan

Contract execution period: 1999 – 2002

Man-hours liquidated under the Contract – 450,000 man-hours    

Contract Scope of Work includes: detailed design, fabrication and supply of 57 industrial buildings of different purpose (compressor facility, pump houses, boiler houses, etc.):

  • for KPC – 39 buildings;
  • for OPF-2 – 18 buildings

Engineering: Design work, including foundations, steel frames, HVAC utilities, Electrical, Instrumentation for HVAC system

Fabrication and Supply:

Subcontracting for fabrication and supply of materials and equipment:

  • anchor bolts;
  • steel structures;
  • electrical trays and racks;
  • equipment for HVAC system

Inspection during materials and equipment manufacturing, expediting, customs clearance, warehousing in the territory of the construction site and preservation of materials and equipment

The post 57 INDUSTRIAL BUILDINGS first appeared on Steppe Khazar Refinery.

]]>
https://Steppe Khazar Refinery.com.kz/2025/04/26/57-industrial-buildings/feed/ 0